3D, 4D, 5D to re-invent engineering services.

Digitised plant assets for low cost plant upgrades.

Our engineers have adopted SiD…

Safety in design is the core

Millions of safe man hours keep ticking…

our dedicated construction management

team ensure it

Complex projects designed, managed and

commissioned amidst multiple

partners…. we manage these complexities

Capabilities to manage and serve you

through the entire project life cycle

SAFETY – No shortcuts here. It runs

all the way up and down

 

Technology & cultural integration – Construction management for Brownfield coke oven and by-product

The construction management of this huge plant with 88 oven chambers meant - Bringing together 11 domestic and international partners.

Interpreting Chinese technology and implementing in Indian conditions, Multiple Indian contractors to be oriented into stringent safety standards & all this managed with no downtime of existing plant.

Technological feats

Dismantling top structural arrangements and brick lining five layers of top coming from a height of 145 meters for a chimney from the outer-side.

Erection of coal conveyor gallery between two coal towers at a height of 54 metres.

Construction of junction house and coal conveyor gallery with 12 metres depth alongside existing coal conveyor.

Installation of large numbers of stainless steel burner pipes, cleaning nozzle pipes in each block of battery within very close tolerance for their locations.

Construction and retrofitting of new cooling tower in by-product area and dismantling of existing cooling tower for clearing front for scrubbers and compressor house.

Construction of cooling tower basin on the roof of process chiller plant.

Construction of 68 metres high quenching tower wall along with refractory work and installation of de-dusting nozzles at 58 and 43 metres inside the quenching tower.

 

International safety standards, commissioning
in record time and retrofitting with no downtime

There were several other challenges especially on account of retrofitting a large facility upgrade with no downtime. These challenges were addressed with innovative solutions which have now become benchmark practices for such a facility erection. The Construction Service unit helped to commission the plant in record time and in concurrence with international safety standards.

Advanced Technologies and Simulation

  • BIM, PLM and Digital 3D/4D/5D Design & engineering services

  • Advanced Technology Solutions

  • Engineering, Automation

  • Plant Management Solutions

  • Constructability Analysis and Site Optimisation

  • Asset Lifecycle Management Solution

  • Engineering Simulation and Optimisation Services

 

TCExpression

4D Simulation

Digital Engineering

Chemical Sector

Mining Sector

Smart City Planning

Case Studies

 
Top