Innovation in design of oven protection shed for coke oven plant.
Tata Consulting Engineers is providing Project management and Construction Management & Safety to a steel major in Orissa. The protection shed design for the battery plan was modified to facilitate a parallel construction and second stage concreting of SCPinner track support. This solution of parallel construction helped with faster stamp charging pusher machine track erection. In real terms, the solution saved project run-time which translated to savings in project costs. The challenge was in the extensive modification of an existing design which had to be done within stringent safety and compliance requirements.