35%), and increases gas production (about

10-12%). Ultimately, it delivers a high quality

(Class A) end product (biosolids).

The end product is a pathogen free and

pasteurized biosolids with minimum odour

which can be applied to land directly as bio

fertiliser. The estimated sludge generation

from the existing and new plant is about

24,000 tonnes dry solids (DS) per year. The

Class A Bio solids has commercial value as it

is used as a fertiliser and hence it generates

revenue to the authority.

This is the first time in India that this

technology (THP) is recommended for

municipal STP. The THP technology is used

in some leading developed cities such as

Washington DC, USA with capacities of

130,000 tonnes DS/year, Manchester UK with

91,000 tonnes DS/year, Oslo Norway with

50,000 tonnes DS/year and London, UK with

40,000 tonnes DS/year, among others.

Technovation

Energy recovery from the sludge helps reduce

green house gas emissions. The waste to

energy solution, is designed to contribute to

about 35% of the total energy requirement

for the operation of sewage treatment plant.

The utilization of biogas for power generation

causes reduction in emission of methane gas,

qualifying as a Clean Development Mechanism

project with eligibility for carbon credits. Since

the energy recovery from sewage treatment

plants is of the nature of ‘non conventional’ i.e.,

‘renewable energy source’, it is eco friendly

and increases sustainability. The estimated

carbon trading price from the proposed

sewage treatment plant is approximately

`

4.61

crores per annum.

With this sustainable project, TCE provided

value to its client by retrofitting STP for

augmented capacities with limited available

footprint (plant premises) and provided

advanced sludge treatment for handling large

volume of sludge generated from the existing

and new plant with better sludge quality for

land applications in limited footprints. The

project implementation period is estimated

at 36 months including trial run, testing and

commissioning.

This project will set the benchmark for

other mega cities in India as a smart, value

engineering solution to handle large volume

of sludge from the sewage treatment plants .

Waste to energy, from liquids and solid wastes,

are sustainable in the long run with state-of-

the-art solutions designed to provide long term

sustainability.