Project Highlights
Engineering consultancy services for power plant, Bhatinda
CE recently signed up for providing Engineering a first, TCE, which recommended wet stack with lower
T Consultancy Services and feasibility study report chimney height concept, was recognised and accepted
to meet the new environmental norms of Ministry by the industry. TCE provided unique solutions to
of Environment, Forest and Climate Change. The TCE minimise the plant/unit shutdown time required during
report got the first technology approval from Central the FGD & DeNOx system retrofit. TCE is pioneering
Electricity Authority (CEA), the first to get this approval similar challenging brown-field projects requiring
among all the private sector Independent Power retrofitting of Emission Abatement systems for various
Producers for FGD and DeNOx system installation. In coal-based thermal power plants across the country.
Power system stability studies for SESA VAB complex, Panaji
ata Consulting Engineers Limited carried out a plant suffered frequent forced outages and blackouts,
T comprehensive electrical system study for one which were due to short circuit faults in the external grid
of its clients SESA VAB complex located in Panaji. The that led to substantial financial losses. TCE recommended
captive power plant comprises two 30 MW steam turbine elimination of interruptions through the implementation of
generators using waste heat from recovered coke oven recommended islanding scheme and protection schemes,
process, and blast furnace processes. The captive power which resulted in enhancing productivity by averting 20
plant operates in synchronism with the state grid. The blackouts in two years.