Page 5 - TATA Consulting Engineers Limited | The Gamsberg Mine Story
P. 5

5





                                                                                                                       Steel Metal & Mining
















































                  development, mass & water balance, process
                  control engineering, P&ID, equipment sizing
                  & selection, layout engineering, CAPEX &
                  OPEX, process audit & performance                 Steel & Metals
                  optimisation studies                              Ferrous
                                                                    raw material handling, iron making (blast
               Material Handling                                    furnace, sinter/pellet/DrI making, coke oven &

               †   Crushing & screening, storage yards,             by-product plant, lime calcining), steel making
                  conveying systems, unloading, stacking,           & ferro-alloys plant, rolling  mills – flats & long,
                  storage & reclaiming system, proportioning,       coating & finishing
                  blending & recycling, truck loading systems,
                  rapid load out system, ship loading &             Non-ferrous
                  unloading systems                                 † †raw material handling, alumina refinery
                                                                       smelting, rolling/fabrication, zinc processing
               Mine Infrastructure

               † †Planning of overall layout, engineering of        † †Shared services and utilities for Steel Metals
                  plant & non-plant buildings & architectural          & Mining
                  designs, roads, hydrology & hydrological
                  studies, water sourcing engineering, power        † †Modernisation solutions through plant asset
                  sourcing & reticulation                              digitisation for upgrades and modernisation








         TCE_Bro2017_Steel Metal & Mining Final (2nd Feb).indd   5                                                  2/7/18   4:35 PM
   1   2   3   4   5   6   7   8