Page 8 - TATA Consulting Engineers Limited | The Gamsberg Mine Story
P. 8

8



                     Key Achievements
               Steel Metal & Mining





                              Project details                           Value additions delivered


                       Feasibility study for               Complex nature of the ore due to low grade Goethite
                       establishment of iron ore           Fe & high content of Alumina & Silica were managed
                       mining & steel production           through beneficiation solutions and production
                       facilities in Ethiopia              facilities planned

                                                           Water resource management (by way of reduction of
                                                           specific consumption of water and by extensive rainwater
                       Pre-feasibility studies and plan
                       for a large diamond mining          harvesting arrangements) solutions that led to cost savings
                       project for an MNC                  through reduction in reservoir capacity, reduction in number
                                                           of dykes for PlSF, reduction in capacity of crushed ore
                                                           stockpile & compact layout with minimal cutting and filling


                                                           Turnkey execution of the project completed in record
                                                           time and in line with international standards. Innovative
                                                           engineering solutions such as design and engineering
                       Engineering consultancy for a
                       blast furnace, the largest in the   of 4-poster structure thereby eliminating the need for
                       country (2013)                      pouring concrete into the hollow structures, engineered
                                                           sequence of installation of the down comer connecting
                                                           blast furnace and gas cleaning plant were premium
                                                           solutions to the client

                                                           The water requirement of 220 CMH was addressed by
                                                           the water collected in reservoirs during monsoon.
                       55,000 TPA High Carbon              Cost-effective water solution was provided though
                       Ferrochrome Plant                   water from Karatali Reservoir (KR) of the State Irrigation
                                                           Department, construction of anicut rain water harvesting,
                                                           ground water, sea water desalination


                                                           Solutions provided resulted in savings of around 100
                       The green field zinc mine           million USD (which is around 25% of the capex). After
                       project consists of open cast       process optimisation benefits included – number of
                       mine, ore beneficiation plant       flotation cells reduced, total effective volume reduced
                       and associated infrastructure in    thus reducing the requirement of air in turn reducing the
                       South Africa                        capacity requirement of blower, overall footprint of plant
                                                           reduced, overall power consumption reduced

                       Consultancy Engineering             Merger of MCC building and optimisation of bin
                       Services for MHS-RlS System         configuration thereby leading to cost reduction to the
                       for iron ore conveying              tune of `10 crore to client