Sub soil investigation, design, analysis, Regional Science Museum at Patan
engineering and preparation of tender TCE is working with DST through GUJCOST to establish
document of Primary Coolant Pump Test five Regional Science Museums (“RSMs”) at Rajkot, Patan,
Facility (PCPTF) building
Bhavnagar, Vadodara and Bhuj. The galleries, activities and
Primary Coolant Pump Test Facility (PCPTF) is proposed exhibits are carefully designed and selected to:
to be set up at R&D Center, Tarapur NPCIL, for testing • Promote innovative and experimental activities through
and qualification of PCP Pumps. Steel structure building hands-on activities
houses equipment for carrying out PCP qualification and
its associated subsystems. For the first time, 3D modelling • Develop a scientific temper
of the structure is done in Revit to minimise the actual • Nurture and stimulate scientific faculties
engineering man hours. All GA DWGS, concrete detailed
drawings, steel structure DWGS are extracted from Revit. • Showcase breakthrough in science and technology
In the result of the same the project is in 30% gross profit. The concept for exhibit planning is derived from the idea
Wrench has been used to ensure quality of deliverables, to of the gallery being a knowledge hub in various sectors of
track the input data from client, for the correspondence, science and its application.
the status of deliverables and percentage progress of
the project.
BENgALuRu pipe rack module and CW system module and non-modular
units such as fuel gas, feed water, GT lube oil and lift oil
ute Porto de Sergipe i (Combined Cycle Power systems, water supply, waste water and main condensate
Plant & hv Systems)
systems. Deliverables include piping BOQs, supports,
A project with state-of-the-art technology H class machine isometrics and GA drawings. Electrical and instrumentation
in 3 on 1 configuration (3 Gas turbine + 3 HRSG + 1 steam scope include cable and interconnecting schedule, earthing
turbine) with generation capacity of 1516MW, is being setup and cable earthing layout, grouping of instrumentation taps.
at Sergipe in Brazil. 3D integrated engineering is being performed on a global
TCE is providing detailed engineering services for the workshare model.
project which includes engineering of modular units such as