A PROJECT
AGRA METRO Detail Design Consultancy
Tata Consulting Engineers and consortium
partners have bagged the Detailed Design
Consultancy for Agra Metro Works under Uttar
Pradesh Metro Corporation Limited. The team
has completed Concept Planning, Tendering
Activities, Detail design works on BIM – LOD 350+
platform for Architecture, Civil, Building Services,
VAC, ECS, TVS, BMS, SCADA, Traction Services for
Elevated Stations (3 Nos), Underground stations
(7 Nos), Depot (1 No) and Traction - RSS (2 Nos).
The tender for Under Ground (UG) station, tunnel
and traction work is ready for floating. The 48
month long projects’ Scope consists of:
Elevated Stations: 6 Nos
Under Ground Stations: 7 Nos
Depot: 1 No
RSS: 2 Nos
Viaduct: 6.569 km
Tunnel/ Ramp: 7.681 km
Traction: 750 V DC – Third Rail